DESIGNING AND CONSTRUCTING A SEASONAL BREEDING POND FOR CALIFORNIA TIGER SALAMANDER AND CALIFORNIA RED-LEGGED FROG: A QUARRY MITIGATION CASE STUDY | |||
| Alicia James Herbert; Environmental Science Associates; AHerbert@esassoc.com; Rebecca Acosta | |||
Creation of breeding habitat is a common mitigation strategy for the federally threatened California tiger salamander (Ambystoma californiense; CTS) and California red-legged frog (Rana draytonii; CRLF), yet few projects document their design process and early performance. In 2025, Environmental Science Associates partnered with Sunol Quarry to design and construct a seasonal breeding pond as mitigation for previous quarry expansion activities. The goal was to create a self-sustaining breeding pond that provides suitable hydroperiods and aquatic conditions for amphibians, while drying seasonally to minimize colonization by predatory non-native species. Pond design incorporated site-specific topography, watershed hydrology, grading requirements, target depths, and other long-term management objectives. The pond filled during the first wet season (winter 2026) and achieved target depths and hydroperiod conditions necessary to support amphibian breeding activities. Initial monitoring indicated pond performance was consistent with design objectives and regulatory success criteria. This poster highlights the design, construction, and early monitoring of the pond, with an emphasis on practical lessons learned and considerations for future amphibian habitat mitigation projects. As breeding pond creation and management continues to play an important role in CTS and CRLF conservation, documenting successful approaches can help improve outcomes for future mitigation and restoration efforts throughout California. | |||
| |||
Speaker Bio: Not needed for poster. |